Haomei linkedin Haomei facebook Haomei twitter Haomei youtube Haomei google Haomei pinterest

Tel: +86-371-65621392

nydia@concretebatchplant24.com‍

haomei asphalt concrete batch plant
Company News

Asphalt Mixing Pant 60 Ton Jam

2022-06-30 17:08:05

The asphalt mixing plant 60 ton jam stands for the asphalt mixing plant with a productivity of 60 ton per hour, in Haomei Machinery, the model is LB800. 60t/h asphalt mixing plant is a small asphalt mixing plant model, together with LB500, LB1000, they are considered to be mini models. While the general modes used on the market are LB500 and LB1000, LB800 is not often seen, only some asphalt mixing plant supply this model.
 

asphalt mixing plant 60 ton jam


Although asphalt mixing plant 60 ton jam is small asphalt mixing plant, we still need to pay attention to the maintenance work during and after operation.
1, The small asphalt mixing equipment should be set on a flat ground. Use square wood to pad the front and rear axles, and fix the overhead tires to avoid sliding during use.
2, Check whether the transmission clutch and brake are sensitive and reliable, whether the connecting components are worn, whether the track pulley is good, whether there are obstacles around and the lubrication of various parts, etc.​​
3, The rotation direction of the mixing drum should be in accordance with the direction indicated by the arrow. If not, it should be connected to the motor.
4, Small-scale asphalt mixing plant equipment should implement secondary leakage protection measures. Before use, it can be officially used after turning on the power supply and passing the empty vehicle operation. During the trial operation, it should be checked whether the rotating speed of the mixing drum is suitable. Usually, the speed of the empty is slightly faster than that of after charging by 2-3 revolutions. If the difference is large, the ratio of the driving wheel to the transmission wheel should be adjusted.
5, When stopping use, the switch should be turned off and the switch box should be locked to avoid misoperation by others.
6. When the concrete is finished mixing or it is estimated to stop for more than 1 hour, in addition to draining the remaining materials, at the same time, the dust accumulation outside the mixing drum should also be cleaned up to keep the machinery clean.
7, After turning on the machine, always pay attention to whether the operation of each part of the asphalt mixing plant 60 ton jam is normal. When the machine is shut down, it is often necessary to check whether the blades of the mixer are bent, and whether the screws are knocked down or loose.


Pre:Drum Mixing Plant Hot Sale

Next:Asphalt Mix Plant Spare Parts

■ Inquiry
Your name :
Your tel :
* Your mail :
Your country :
Your address :
* Inquiry :