Haomei linkedin Haomei facebook Haomei twitter Haomei youtube Haomei google Haomei pinterest

Tel: +86-371-65621392

nydia@concretebatchplant24.com‍

haomei asphalt concrete batch plant
Company News

Hot Mix Asphalt Plant Cost

2022-09-30 16:22:59

For a large road project, an asphalt mixing plant is critical, and the hot mix asphalt plant cost needs to be considered carefully. Many projects with quality problems and construction schedule problems are the result of making the wrong decision at the beginning in the selection of the asphalt mixing plant. The choice of asphalt mixing plant is crucial, so how exactly should you choose a hot mix asphalt mixing plant?
 

One: Economic aspects
Economy is, frankly speaking, low price, which economy contains: the cost of raw materials, processing costs, distance aspects. As a manager to focus on the distance problem, especially in highway construction in many places to prohibit overloading, the proportion of transport costs may increase a lot.
 

hot mix asphalt plant cost


Second: the site of the hot mix asphalt plant
1, The site of the asphalt mixing plant is known to accommodate the amount of material, this is the choice of hot asphalt mixing plant to consider the most important.
Road asphalt pavement construction is characterized by a short time cycle, construction progress, with the formalization of the construction industry, stone preparation will become a necessary requirement for future owners, supervisors. Even if not required, as a qualified manager should also have the consideration of material preparation. How much material is not only related to the construction progress, and very often more related to the quality of the finished asphalt mixture (stone is not prepared in advance, may face late material tension, the stone itself fluctuations in the grade, which affects the construction ratio).
2, The site of the asphalt mixing plant also involves whether the site is hardened.
If a stone plant silo site is not hardened, will invariably increase the loss of raw materials, this can be asked around the material personnel.
3, Is there a color steel shed in the preparation area of the hot mix asphalt mixing plant?
Asphalt plant hot mix preparation area does not have color steel shed, after a rain, the stone material may not be dry even after the project. What will happen when the stone is wet? Affect the production efficiency, affect the quality.


Three: Asphalt mixing plant equipment
1, First understand the model of asphalt mixing plant: 3000 type? 4000 type? 2000 type? Does it meet the needs of the daily output of the work surface?
2, To understand the number of asphalt tanks, the size of the mineral powder tank, to understand whether to meet the needs? Make a good material supply plan.
3, Know the sieve size of the hot material sieve in the asphalt mixing station, does it meet the construction grading requirements?
4, Understand the fuel used for heating in the asphalt mixing plant, is it heavy oil? Is it light fuel oil? Is it natural gas? This is related to the hot mix asphalt plant cost.
Asphalt mixing plant selection of the above three points must be considered, but in the selection process according to the project characteristics and many considerations. Remember that asphalt pavement construction is divided into front paving and backyard production, both occupy an equal position, and backyard production in the choice of asphalt mixing plant accounted for more than 80% of the proportion.


Pre:Small Mobile Asphalt Mix Plant

Next:Oil Burner For Asphalt Mixing Plant

■ Inquiry
Your name :
Your tel :
* Your mail :
Your country :
Your address :
* Inquiry :