Professional asphalt hot mix plant manufacturers provide high quality equipment as well as guideline preparations before starting the asphalt mixing plant. As a special equipment, standardize the operation process of the important production tool of the asphalt mixing plant, do daily maintenance, perform regular inspections, eliminate hidden dangers of accidents, etc., which can effectively ensure the safety and stability of the equipment and prevent the wrong operation from causing the equipment Damage and loss, and good maintenance operations can also greatly increase the life of the asphalt mixing plant. Therefore, before the daily operation, we must properly maintain the asphalt mixing plant, so that the asphalt mixing plant can operate better.

asphalt hot mix plant manufacturers 

Before starting the whole asphalt hot mix plant for the first time every day, be sure to start the air compressor, manually test whether the three weighing scale doors and mixing tank door opening and closing actions are normal and detect whether the in-position signal is normal. If the above manual test machine is normal, then start asphalt spray pump test spray pump, at the same time to open the asphalt circulation pump to detect whether it can start normally. If it is normal, then enter the normal start of the whole machine. The purpose of this is to confirm that the mixing system of the asphalt hot mix plant is working properly and that the asphalt spray pump is operating normally, to avoid that the door cannot be opened, the mixing tank door cannot be opened, the spray pump cannot be started, and the automatic mixing is not possible after the whole machine is started Fault conditions.

 

Before starting the automatic ignition of the drying drum burner, asphalt hot mix plant manufacturers suggest you be sure to start the induced draft fan (appropriate damper) of the asphalt station and the burner blower, and let them run for a few minutes before entering the burner automatic ignition program. This is mainly to exhaust the smoke in the drying drum to avoid the possibility of explosion of the drying drum or the explosion of the dust box during the ignition process of the burner, especially after more than two consecutive ignition failures and re-ignition and the drying drum is still at high temperature. Pay attention to this detail when igniting again.