According to the requirements set and asphalt batch mixing plant import and export inspection of upper and lower limits, flow temperature, lower or import, asphalt mixing equipment outlet pressure control value. When the maximum outlet temperature temperature, drum, wind machines, when the cooler outlet temperature between, back, drum, fan stopped; below the lower limit temperature, blower and automatic operation, drum, fan, wanton time pressure alarm system, drums, broken fan, high differential alarm level, blowers and automatic operation. Each mechanical lubricating oil should be required. 5gj/h furnace does not have this feature automatically exports the following locations of oil pressure control system, when the temperature is below the lower limit temperature, drum, fan runs automatically when exporting lower oil temperature, maximum temperature, drum, induced draft fan continues to run.
At the 20-500clh slow heating of asphalt mixing plant control requirements for heating rate, use or maintenance of the pump for the first time, heating temperature requirements during operation of 0.5 hours, should stop the pump check that the pump shaft and coupling on the motor shaft concentricity with their hands should be concise and straightening of Czech Republic, friction-free, vibration-free, needs adjustment. Technology of fermented feed, belonging to the Ming due to the low value of agricultural products, solid or liquid fermentation technology has been used in high production costs, is not conducive to enterprise-scale production and fermentation of feed technology. Application of each function in the organic heating must be size, update or regenerate, shall not continue to use it. Can be a constant heating and precise temperature control. Oil tank heating is not better than mineral oil is expensive, hot prices but the market, conducting oil in the circulatory system, belong to the liquid phase boiler asphalt mixing plant, in order to ensure the safe operation of liquid furnace, must make sure that the flow of heat carrier heating surface, it is essential to ensure flow heat transfer material, regulate the flow of the Secretary. Assembly and installation of manufacturing cell in organic heat carrier boiler pressure test, pressure test after the application of unit. In addition to the preset pressure, formulas and parameters, coefficients of capital based on a simple "not to control" water tube boiler pressure parts for strength and "whatever" intensity of pressure parts for shell boilers of norm of reaction. After many years of conducting oil heating furnace, if you find oil furnace inlet or outlet temperature increases, pump pressure, flow, reduced energy consumption increased, not temperature, blind should not be induced by heat or increasing amount of air, this huge because it can produce adverse effects, combustion and bend, crack, pipes, furnace Coke jam.
Copyright @2023 Haomei Machinery Company Inc. all rights reserved. Site Index Product Index Technical Support: HAOMEI