RD105 Asphalt Mixing Plant
NO |
Technical performance |
Specification |
1 |
Capacity |
105t/h |
2 |
Rated mixer capacity |
1250kg/Batch |
3 |
Oil consumption(Standard) |
6.5kg/t |
4 |
Dimension |
37m×34m×14m |
5 |
Install power(Standard) |
250.76 kW |
6 |
Operation mode |
Manual/Automatic/ Semi-automatic |
7 |
Reference No. |
|
105t/h Asphalt Mixing Plant Standard Specification
105t Asphalt Mixing Plant |
Standard Specification |
Four Hoppers |
4×6.5m3 |
Drying Drum |
Φ1.8m;Length:8m |
Burning System |
Automatic China Light oil Burning system ; 20m³ light oil tank prepared by customers |
Hot Aggregate elevator |
Double chain backet |
Dust collecting system |
Gravity dust catcher; cyclone dust catcher; water dust catcher |
Vibrating Screen |
Four layers;5×5、12×12、25×25、37.5×37.5mm |
Mixer |
4 layer screen ;1250kg/batch |
Weighing System |
Aggregate, filter and asphalt weighing system |
Filter Supply System |
1.8m³temporary storage |
Asphalt Supply System |
asphalt tank35m3 with directing heating; Italian light oil burning; Double layer by heating |
Pneumatic control system |
Taiwan Airtac |
Control System |
3m×2.2m×2.5m Control room;Japan OMRON PLC |
SHIPPING PLAN |
12x40HQ |
About RD105 Asphalt Mixing Plant Other Items
Other Items Delivery: we will finish manufacturing a set of RD105 batch asphalt mixing plant at the factory within 45 calendar days for delivery from receipt of order and 30% advance payment Validity: 30 calendar days from date of proposal Warranty: 12 months from date of signing the Plant Acceptance report Payment: the buyer should pay 30% of contract value by Telegraphic Transfer (T/T) to the seller as advance payment within three days dated from signing the contract; the residual 70% contract value will be paid by Telegraphic Transfer before delivering the goods from the factory. Installation and commissioning: we will send one engineer for plant Installation & commissioning and training operator during 20 days for free; after 20 days max 30 days we will charge 80US dollars/day/ engineer. The buyer will afford return flights out of china and visa application expenses, local accommodation, medical, safety and travel expenses of seller’s engineers in local. And provide a Chinese translator to help the engineer’s work. |