asphalt mixing plant installation notes

asphalt mixing plant installation notes

Asphalt concrete is widely used in various kinds of capital construction. To realize mobility and fast set up of the asphalt mixing plant has great significance to the development of base construction of the country. To build up an asphalt mixing plant successfully, the asphalt mixing plant installation notes are so significant.

2.jpg

 

The installation notes of an asphalt mixing plant are:

1, site selection before installation

  • The principle of selecting the install site is as follows, due to the cover area of large asphalt mixing equipment is large, the stacked stone should have certain storage capacity. When choosing the site, it should be closed to the roadbed, and located in near the halfway point of the block, convenient source of water, electricity, raw materials and finished product traffic is convenient.
  • About the site natural environment, it should be dry, ground surface topography is a bit high, underground water level is low, choose good site geological conditions, and can reduce the cost of the installation of equipment, avoid deformation and subsidence of equipment. Due to the moisture content of raw materials has a great influence on the production of asphalt mixing plant, high moisture content will increase fuel consumption, production capacity will decline, increase practical cost, therefore, to have good drainage system around the equipment is important.

2, installation

  • The preparation before installation.Before all the auxiliary equipment and complete sets of equipment arrived at the site, draw the assembly and foundation location picture to ensure a successful operation when installation. The installation site should comply with the requirements. organize an experienced installation team to enter the construction site, installation personnel are as follows: 1 organizers , 2 technicians (mechanical engineers, electrical engineers), 4 installed fitter, 2 install electrician, 1 electric rigger, 1 welder,1 management worker,4-6 labor, soil carpenter.
  • The necessary tools of installation. Steam crane (lifting press depends on the largest component),5 t jack, 30 m big line, 10 m retractable ladder , more than 3 m herringbone ladder, crowbar, hammer, scissors, hand saw, grinder, line pressing pliers, all kinds of commonly used tools such as wrench, seat belts, level, complete ZL50 loader.
  • The main sequence of installation. Mixing console - drying drum - powder machine, aggregate elevator - cloth bag dust collector - cold - finished product storehouse - control - wiring.